Storage Shed moved in
Adding a 2" clean crush rock base seems the easiest and cheapest solution to create a leveled pad for the shed, and it will be good for drainage under the shed anyway. We used 5 yard rock and took us 3 hours to make it as flat, as compact as we can.
The driver told me the truck just made the max height limit when he crossed the bridge - the only way to get here if you don't want drive another extra hundred kilometers through another town.
They used car jacks to make sure the shed is leveled on the ground after it's off the truck bed. It was a tedious process with a lot of back forth adjustment. It is well done at the end and looks good, even comes with a ramp for the garage door.
The only thing I need to do is to make a stairs for the other door. The date for that is not set yet :)